RFP Issue date in April 2015
Issue Date | Details | Response Date | Service/Issued by |
---|---|---|---|
1 April 2015 | RF Analyser Hand Held (4-6 GHz) | 26 May 2015 | Indian Army |
8 April 2015 | Combustile cartridge, Qty 800 | 30 April 2015 | DRDO |
7 April 2015 | Wind Direction and Speed Sensors, Qty 02 Nos. | 28 April 2015 | Indian Air Force |
10 April 2015 | Ballistic Helmet Qty 6478 Nos | 18 May 2015 | Indian Army |
10 April 2015 | Cartg Percen Primary for Cluster Bomb (Empty Assy), Qty 418 No. | 15 May 2015 | OFB |
13 April 2015 | Integrated Communication system Qty-06 Nos. | 29 May 2015 | NSG |
13 April 2015 | Bullet Proof Harness with Shoulder Pad, Qty 4600 Nos. | 15 May 2015 | BSF |
15 April 2015 | NI based test bed with target environment simulator for IMR SAR – sensor | 7 May 2015 | DRDO |
13 April 2015 | Fuze Holder DPK1-1, FUSE PTS-30-1, Junction Box, Connector | 30 April 2015 | OFB |
17 April 2015 | Bullet Proof Jacket, Qty 50,000 Nos. | 19 May 2015 | Indian Army |
20 April 2015 | Bullet Proof Watch Tower | 15 May 2015 | Indian Air Force |
25 April 2015 | Integrated Plant For Manufacture of 5.56 X 45MM Cartridge Cases. Minimum Output of Plant is 28800 Parts / HR | 3 July 2015 | OFB |
27 April 2015 | Deep Search Metal Detector (DSMD), Qty-03 Nos. | 21 May 2015 | CRPF |
27 April 2015 | Integrated Plant for Manufacture of 9 MM CARTG. Case. Minimum Output of Plant 14400 Parts / HR AT 100% Efficiency & Inaccordance With AFK Specification | 10 July 2015 | OFB |
27 April 2015 | Half Body Suit, Qty- 10 Nos | 11 Jun 2015 | NSG |
28 April 2015 | Aerostat Radar, Qty 01 Nos. | 21 May 2015 | Indian Air Force |
28 April 2015 | Metal Components of Mechatronic Fuze | 4 June 2015 | DRDO |
30 April 2015 | NBC Suit | 20 May 2015 | DRDO |